Roofs & drainage
What should you check before the first heavy autumn rain in the Algarve?
The first intense rain is a poor time to discover that a downpipe, terrace outlet or drainage channel is blocked. A short pre-rain check creates useful evidence and separates routine cleaning from defects that need repair.
Updated 17 September 2026 · 5 min read

Follow the water from high to low
From safe ground, identify roof edges, gutters, downpipes, parapet outlets, terrace drains, patio channels and the final discharge point. Look for leaves, nests, moss, soil, displaced grilles and staining that shows previous overflow.
A clear opening is not enough if the next section is blocked or discharges against the wall.
- Photograph each outlet before cleaning
- Check that covers and grilles are seated correctly
- Keep movable objects away from flow paths
Use a controlled water test where appropriate
On accessible ground-level drains, a modest controlled test can show slow flow, back-up or leakage at a joint. Do not flood a roof, use a hose near electrical equipment or test a system when the receiving drain is already overloaded.
If water disappears into a concealed route, record the entry and visible exit instead of assuming the full path is sound.
Know when cleaning is not enough
Repeated overflow, cracked joints, loose gutters, water behind render, ponding on a terrace or discharge next to the foundation can require repair or redesign. Take wide and close photographs and repeat the same positions during the next rain from a safe place.
- Treat unstable fixings and falling elements as hazards
- Record interior damp near the same wall
- Keep access instructions ready for an absent owner
Before requesting an estimate
Before requesting an estimate
- Roof edge and gutters viewed from safe ground
- Downpipe outlets and final discharge points
- Terrace, patio and pool-area drains
- Before-and-after photographs plus any recurring overflow
Sources and further reading
Product instructions and the condition of the property always take priority over general guidance.

